State  Capital  Parking  Facility 

Contract  Amount:  $869,742.52

Client:  NM  Legislative  Council  Service

Architect:  Lorn  Tryk  Architects

Duration:  180  Days

Brief  Description  – Repair/reconstruction  of  parts  of  the  existing  garage  structure  damaged  due  to  soil  consolidation  below  structures,  Portions  include:

  • North  Sidewalk  with  integral  snow  melt  system  to  be  demolished  and  rebuild  with  drilled  helical  pier  supports
  • Interior  slab,  fixtures,  finishes  in  office,  restroom  and  storage  area  to  be  demolished  and  rebuilt  with  drilled  helical  piers  supports
  • Precast  concrete  yard  walls  on  south  side  of  garage  to  be  stabilized  with  drilled  helical  pier  supports.
  • Exterior  gravel  surfaced  graded  areas  on  south  side.  Gravel  to  be  removed,  area  regraded  and  waterproofed  and  new  gravel  surface  applied.
  • Remove  and  refinish  hand  rails  to  entrance  to  the  NM  State  Capital.