Vigil Maldonado Detention Center 

Contract  Amount:  $7,682,931.00

Client:  Colfax  County

Architect:  Vigil  &  Associates

Duration:  365  days

Brief  Description  –

  • A two tier  Pod  addition  with  24  cells/48  beds  (approx.  5,940  sf)  of  CMU  exterior  walls  with  interior  pre-manufactured  metal  security  cells  complete  with  furniture  and  fixtures.  The  pod  addition  includes  a  sub  control  area,  two  outdoor  exercise  areas  with  security  cage  ceilings,  a  rear  hall/access  chase  with  steel  ship  ladders  for  access  to  second  tier  chase,  concrete  filled  composite  metal  deck  at  the  second  floor  with  a  secure  cage  partition  wall  at  balcony,  concrete  filled  steel  pan  stair  construction,  and  double  dome  skylights.
  • Medical Suite  &  Kitchen  addition  (approx.  2,540  sf)  consisting  of  a  full  service  commercial  kitchen  with  new  walk-in  freezer/cooler,  laundry  room  with  new  washers/dryers,  medical  exam  room  with  two  (2)  premanufactured  metal  security  cells  complete  with  furniture  and  fixtures,  an  office  and  storage  room.  This  addition  houses  new  mechanical,  electrical,  and  security  electronic  support  spaces  for  the  entire  facility  at  completion.
  • Administration addition  (approx.  1,370  sf)  consisting  of  an  entryway  vestibule,  waiting  area,  offices,  conference  room,  and  staff  lounge.
  • Storage addition  (approx.  250  sf)  for  inmate  property  to  include  two  sets  of  double  doors  and  shelving.
  • Security Electronic  Systems  include,  but  are  not  limited  to,  master  controls/  equipment,  secure  door  controls  and  hardware  at  all  new  and  existing  doors  (including  cell  doors),  intercom  system,  and  CCTV  system  at  interior  and  exterior.
  • MEP systems  include,  but  are  not  limited  to,  new  medium  and  maximum  type  devices  and  fixtures,  smoke  evacuation  systems,  existing  ductwork  to  remain  at  existing  Pods  A,  B,  and  F,  new  rooftop  units  at  most  existing  pods  (rooftop  unit  at  Pod  B  and  existing  MAU  at  kitchen  to  be  reinstalled),  new  transformer  and  back-up  generator,  new  fire  and  domestic  water  to  Pod  addition,  new  sewer  main  and  grinder,  and  new  gas.
  • Site work  includes,  but  is  not  limited  to,  site  grading  and  drainage,  perimeter  security  chain  link  fencing  (14ft  high  with  barbed  wire  and  embedded  chain  link  fence  into  a  continuous  concrete  curb),  automatic  chain  link  gates,  base  course  fire  apparatus  road,  site  utilities,  new  site  light  poles,  new  paved  parking  lot,  concrete  paving,  and  new  planting.